![Study on the fatigue performance of steel-composite grillage deck of large-span arch bridge - Extrica Study on the fatigue performance of steel-composite grillage deck of large-span arch bridge - Extrica](https://static-01.extrica.com/articles/23344/23344-img7.jpg)
Study on the fatigue performance of steel-composite grillage deck of large-span arch bridge - Extrica
![ICON Engineering - ICON works in with operators and support contractors to ensure well test equipment is adequately restrained on deck. ICON Engineering - ICON works in with operators and support contractors to ensure well test equipment is adequately restrained on deck.](https://www.iconeng.com.au/image/2fba5e0439902c28979cde5988b5cf0f_960_600_cropped.jpg)
ICON Engineering - ICON works in with operators and support contractors to ensure well test equipment is adequately restrained on deck.
![Electric railway journal . te, were erected witha standard 75-ton wrecking derrick, fitted with a special 90-ft.boom capable of lifting either the steel or concrete poles ata point 90 ft. from Electric railway journal . te, were erected witha standard 75-ton wrecking derrick, fitted with a special 90-ft.boom capable of lifting either the steel or concrete poles ata point 90 ft. from](https://c8.alamy.com/comp/2CRAHRT/electric-railway-journal-te-were-erected-witha-standard-75-ton-wrecking-derrick-fitted-with-a-special-90-ftboom-capable-of-lifting-either-the-steel-or-concrete-poles-ata-point-90-ft-from-the-center-of-the-track-the-concretepoles-were-lifted-from-the-cars-on-which-they-were-loadedand-placed-on-timber-horses-adjacent-to-the-excavation-wherethey-were-to-be-set-the-cross-arms-and-grillage-were-thenput-in-place-and-the-pole-thus-equipped-was-picked-up-at-thetop-and-lowered-into-the-excavation-the-steel-poles-werepicked-up-from-the-embankment-where-they-had-been-un-loaded-and-lifted-2CRAHRT.jpg)
Electric railway journal . te, were erected witha standard 75-ton wrecking derrick, fitted with a special 90-ft.boom capable of lifting either the steel or concrete poles ata point 90 ft. from
![ICON Engineering - ICON works in with operators and support contractors to ensure well test equipment is adequately restrained on deck. ICON Engineering - ICON works in with operators and support contractors to ensure well test equipment is adequately restrained on deck.](https://www.iconeng.com.au/image/61a66a60e7ce45f74044328f2ca875de_960_600_cropped.jpg)
ICON Engineering - ICON works in with operators and support contractors to ensure well test equipment is adequately restrained on deck.
Derrick Cranes Specialized Application Cranes For Sale in SYDNEY, NEW SOUTH WALES, Australia - 1 Listings | MarketBook Canada
![Alternative Foundations: The use of amphibious equipment and a helical foundation solution helped to address site constraints in South Jersey — Aldridge Alternative Foundations: The use of amphibious equipment and a helical foundation solution helped to address site constraints in South Jersey — Aldridge](https://images.squarespace-cdn.com/content/v1/55070a56e4b082eea4ce48e5/1641327769812-QRVDQB4YACEKWFV85U30/aldridge-electric-alternative-foundation-solutions-helical-piles-amphibious-drilling.png?format=500w)
Alternative Foundations: The use of amphibious equipment and a helical foundation solution helped to address site constraints in South Jersey — Aldridge
![Study on the fatigue performance of steel-composite grillage deck of large-span arch bridge - Extrica Study on the fatigue performance of steel-composite grillage deck of large-span arch bridge - Extrica](https://static-01.extrica.com/articles/23344/23344-img4.jpg)
Study on the fatigue performance of steel-composite grillage deck of large-span arch bridge - Extrica
![Study on the fatigue performance of steel-composite grillage deck of large-span arch bridge - Extrica Study on the fatigue performance of steel-composite grillage deck of large-span arch bridge - Extrica](https://static-01.extrica.com/articles/23344/23344-img5.jpg)